AngXin Solid Control

English
Company Profile

About AngXin Solid Control

Engineering Support for Solids Control and Trenchless Projects

Tangshan AngXin Technology Co., Ltd. was established in 2019, building on industry experience in drilling-fluid solids control that began in 2010. We supply equipment, replacement components, and custom sealing products for drilling, HDD, TBM, and microtunneling applications.

Tangshan AngXin Technology equipment and facilities
Since 2010 Industry experience in solids control
Established 2019 Tangshan AngXin Technology Co., Ltd.
Global Support International project and delivery coordination
Custom Supply Equipment and components based on confirmed requirements

Who We Are

From Drilling-Fluid Separation to Tunneling Components

AngXin supports contractors, drilling companies, equipment service providers, and industrial buyers who need practical equipment and replacement components for demanding field applications. Our work covers drilling-fluid solids control, mud separation and recycling, compatible shaker screen replacement, hydrocyclone supply, and selected products for HDD and shield tunneling projects.

We begin with the operating requirement rather than a generic catalog recommendation. Model compatibility, dimensions, materials, working conditions, quantity, documentation, and delivery expectations are confirmed before an order moves forward.

Application-Focused Communication

Product recommendations are based on the equipment model, process requirement, operating environment, and confirmed technical information.

Clear Technical Confirmation

Key specifications, drawings, compatibility information, and order requirements are reviewed before production or sourcing.

International Delivery Coordination

We support documentation, packaging, shipment preparation, and communication for customers in multiple international markets.

What We Supply

Product Lines Built Around Real Applications

Our product range connects complete process equipment with the replacement parts and custom components required to keep drilling, separation, and tunneling projects moving.

Drilling-Fluid Solids Control Equipment

Shale shakers, vacuum degassers, mud cleaners, desanders, desilters, mud-gas separators, flare ignition devices, mixing equipment, pumps, tanks, and supporting system components.

View solids control equipment

Shaker Screens and Hydrocyclones

Compatible replacement shaker screens, rubber mountings, desander cones, desilter cones, and hydrocyclone components for commonly used equipment models.

View screens and replacement parts

TBM, MTBM, and HDD Components

Custom launch and entry seals, rubber gaskets, waterstop products, HDPE V-lock lining sheets, conveyor components, and selected parts for trenchless and tunneling applications.

View TBM and HDD products

Waste Management and Auxiliary Equipment

Equipment and supporting components for drilling-waste handling, solids-liquid separation, material transfer, cleaning, mixing, and project-specific process requirements.

View environmental equipment

How We Work

A Clear Path From Requirement to Delivery

Industrial orders often depend on accurate model, material, dimension, and operating information. Our process is designed to confirm those details early.

01

Share Requirements

Send the equipment model, application, dimensions, material needs, quantity, drawings, photos, or current part information.

02

Technical Confirmation

We review compatibility, specifications, scope, documentation, packaging, and delivery requirements before quotation confirmation.

03

Production and QC

Manufacturing or sourcing proceeds according to the confirmed order, with dimensional, material, and order-specific checks as required.

04

Delivery and Support

We coordinate packing, shipment documents, delivery communication, and technical follow-up for the supplied products.

Applications

Industries and Projects We Support

The same separation or sealing component can perform very differently across operating environments. Each inquiry should be matched to its actual application.

Oil and Gas Drilling

Drilling-fluid treatment, solids control, gas separation, mud circulation, and compatible replacement components.

HDD and Trenchless Work

Mud recycling, slurry separation, cyclone desanding, material handling, and supporting project equipment.

TBM and Microtunneling

Launch and entry sealing products, rubber components, lining products, conveyor parts, and drawing-based custom supply.

Drilling-Waste Management

Cuttings handling, solids-liquid separation, transfer equipment, drying, filtration, and supporting process components.

Company History

Growing Through Products, Applications, and International Projects

2010

Industry Experience Began

The team began building practical experience in drilling-fluid solids control, separation equipment, and related field applications.

2019

Tangshan AngXin Technology Was Established

The company was established to supply solids control equipment, replacement components, and application-focused industrial products.

2021

International Supply Expanded

Products were supplied to customers in markets including Saudi Arabia, Kuwait, Mexico, and Malaysia.

2023

TBM Sealing Products Reached More Projects

The company expanded its supply of custom rubber sealing products for tunneling applications, including projects in Canada and Australia.

Today

Focused on Practical Project Support

AngXin continues to develop its equipment, replacement-part, and custom-component offering for drilling and trenchless customers worldwide.

Quality and Inspection

Factory Inspection and Witness Acceptance

Orders are inspected in house before they are released for packing. Where the contract asks for a client witness or a formal factory acceptance, the procedure below is used and the records stay with the batch.

Factory release inspection

Routine factory inspection is completed in house before shipment. Dimensions, material, marking and packing are checked against the confirmed order, and the result is logged against the batch that is being released.

The sampling ratio is agreed with the order rather than applied as one figure across the whole catalogue, because it follows the part family, the batch size and the items to be witnessed. The ratio used is stated on the inspection sheet that travels with the shipment.

Drawing and revision

Dimensions and tolerances are measured against the drawing revision confirmed on the order.

Material and certificate

Wire mesh, frame, rubber, polyurethane or lining material is checked against the specified grade, and the material certificate is kept for the batch.

Screen designation

Mesh range and layer count are confirmed against the API RP 13C designation quoted for the panel.

Sealing performance

Rubber seals are checked with an elastic tension test and a compression sealing test where the drawing requires it.

Marking

Part marking, printed logo and name plate data are checked before the item is packed.

Packing and documents

Carton and plywood packing, quantity and packing list are checked, and the inspection log is filed with the shipment documents.

Client Witness Inspection and Factory Acceptance Procedure

1

Pre-arrangement

  • Written notice by email at least 3 working days before arrival, with the inspector's name, contact details, scope of the witness inspection, required test items and acceptance criteria.
  • The production batch, inspection records, measuring tools, test jigs and technical documents are prepared before the visit.
  • If a third-party witness is required at the same time, the laboratory is booked in advance.
2

On-site reception

  • Welcome and site safety briefing covering PPE, restricted zones and site rules.
  • Document review: drawings, material certificate, in-house inspection log and the batch production record.
  • Witness of the visual and dimensional checks, with samples drawn at random by the client inspector, plus the in-house performance test where it was agreed.
  • Both parties sign the witness inspection record. Photos and video are taken with mutual consent.
3

Disposition and closing

  • All items pass: the Factory Acceptance Certificate is signed and the goods are released for packing and shipment.
  • Non-conformities found: a corrective action plan is submitted, and re-inspection or a re-witness is arranged after rework.
  • After acceptance: a scanned copy of the certificate is issued, and the signed original travels with the shipment documents.

Terms and On-Site Support

Standard working hours

Monday to Friday, 8:30 to 17:30. A weekend witness inspection needs prior confirmation and may incur an overtime cost.

On-site support

Meeting room, technical support and an English interpreter are provided for the inspection.

Tell Us What Your Project Requires

Send your model, dimensions, drawings, operating conditions, quantity, and delivery destination. Our team will review the information and respond with the next technical or commercial step.

Contact AngXin Sales
AngXin © All Rights Reserved.    POWERED BY UEESHOP